This project involved geotechnical exploration and design for two new anchored bulkhead structures to replace the failed bulkhead and to allow for dredging against the new bulkhead. The new structures include a 300-foot long bulkhead with a 31-foot vertical exposure, and a 500-foot long bulkhead with a 21-foot vertical exposure. The bulkheads were designed for a 1,000 psf surcharge, earthquake loading, earth loads, and tidal changes. Anchorage systems include sheetpiling and tiebacks.
Client: CLE Engineering |