     Water Resource Projects
 

Tern Harbor Marina
Bass River Marina
Glades Sea Wall
Horseneck Beach
Massachusetts Dam Inspection
Quonset Development

 
 

Tern Harbor Marina
Weymouth, Massachusetts

 

 

 

This project involved geotechnical exploration and design for two new retaining structures. A 400-foot long anchored bulkhead with a 21-foot vertical exposure was designed to replace an existing bulkhead wall which will become obsolete with plans for dredging near the marina. A 100-foot long cantilever wall with a nine-foot vertical exposure was also designed to improve the storage capacity of the marina.

Client:  CLE Engineering

 
 

Bass River Marina
West Dennis, Massachusetts

 

 

 
This project involved performing a geotechnical design with construction oversight for two new bulkhead structures for the Bass River Marina. A 130-foot long anchored bulkhead with a 14-foot vertical exposure was designed and constructed in areas were travel lift usage was expected. The anchorage for the bulkhead was provided by helical anchors attached to the back of the wall. Load testing of the anchors were performed as part of the design validation phase of the project. In pedestrian areas a 145-foot long cantilever bulkhead with a 12-foot vertical exposure was designed.

Client:  CLE Engineering

 
 

Glades Sea Wall
Scituate, Massachusetts

 

 

 

A geotechnical analysis was conducted for the 420-foot long by 8-foot high cantilever wall. The analysis included checking the sliding stability, overturning stability, bearing capacity, and global stability of the wall.

Client: CLE Engineering

 
 

Horseneck Beach
Westport, Massachusetts

 

 

 

The Horseneck Beach Project involved conducting a subsurface exploration program to determine the geotechnical properties required for the design of two new Bath House Facilities. Design reports were prepared for use by the structural engineer for the project.

Client:   CLE Engineering

 
 

Massachusetts Dam Inspection
Eastern Massachusetts

 

 

 

Deere & Ault Consultants performed visual inspections in accordance with Massachusetts General Law for 23 dams in eastern Massachusetts. The work included preparing the checklists and Inspection/ Evaluation Reports required by the Office of Dam Safety (Department of Conservation and Recreation).

Client:   Weston & Sampson Engineering

 
 
Quonset Development
Davisville, Rhode Island
 

 

 

This project involved geotechnical exploration and design for two new anchored bulkhead structures to replace the failed bulkhead and to allow for dredging against the new bulkhead. The new structures include a 300-foot long bulkhead with a 31-foot vertical exposure, and a 500-foot long bulkhead with a 21-foot vertical exposure. The bulkheads were designed for a 1,000 psf surcharge, earthquake loading, earth loads, and tidal changes. Anchorage systems include sheetpiling and tiebacks.

Client:   CLE Engineering

 
 